Newport Beach Breaks Ground on $5.5-Million Trash Interceptor for Newport Harbor

By Newport Indy Staff – September 15, 2023

Source: Newport Beach Independent – https://www.newportbeachindy.com/newport-beach-breaks-ground-on-5-5-million-trash-interceptor-for-newport-harbor/

Newport Beach City Council members, joined by state and county elected representatives, held a ceremonial groundbreaking event on Friday, Sept. 15 to kick off construction of the Newport Bay Trash Interceptor, a sustainably powered system to collect floating trash before it enters the Upper Newport Bay Nature Preserve, Newport Harbor and beaches.

The $5.5 million system will be built in the San Diego Creek, about 800 feet upstream from the Upper Newport Bay Nature Preserve. It is expected to capture 80 percent of the floating trash and debris from the San Diego Creek. Depending on the amount of rainfall, between 100 and 500 tons of trash reaches the Upper Newport Bay via San Diego Creek every year.

In July, the Council awarded the $3.9 million construction contract to Brea-based Jilk Heavy Construction, Inc. The system is expected to be operational by December 2024.

Water Wheel Trash Interceptor

The solar-powered, debris-gathering water wheel in Baltimore, the same concept that is proposed for Newport Bay. — Photo courtesy of Billy Dutton/Baltimore waterfront ©

The Trash Interceptor, modeled after a similar project in the Baltimore Harbor, will sit on a floating platform that rises and falls with the tide. The platform will be secured to the creek bottom by guide piles. The platform will hold a 14-foot wheel that spins using power from the river current or solar panels to move a conveyor belt.

Trash floating downriver is then collected in four steps:

  1. A boom system directs floating trash toward the Interceptor.
  2. A spinning rake moves trash from the boom area to the conveyor belt.
  3. Trash is deposited from the conveyor belt into a collection container.
  4. When full, the container is moved by a short rail system to be transferred to a standard trash truck.

The Trash Interceptor will supplement other City trash-reduction efforts already in place, such as trash booms, catch basin collection systems and floating skimmers.
Project partners recognized at the event included:

  • State Senate District 37 Rep. Dave Min
  • State Senate District 36 Rep. Janet Nguyen
  • State Assemblymember (District 72) Diane Dixon
  • Orange County Board of Supervisors District 5 Supervisor Katrina Foley
  • State of California Dept. of Water Resources
  • Ocean Protection Council
  • Orange County Transportation Authority
  • Help your Harbor/Surfrider Foundation
  • CR&R Environmental Services

Source: Newport Beach Independent https://www.newportbeachindy.com/newport-beach-breaks-ground-on-5-5-million-trash-interceptor-for-newport-harbor/

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

Newport Harbor Dredging Project

By Laylan Connelly – Orange County Register Officials have secured $8.3 million to dredge Newport Harbor in the $14 billion Infrastructure Investment and Jobs Act, but sand replenishment projects for two stretches of Orange County coastline were not included. U.S. Rep. Michelle Steel said dredging of Newport Beach’s harbor is long overdue in her announcement […]

Corona del Mar resident Paul Blank was named Newport Beach Harbormaster last spring, a grand achievement to cap off an on-the-water lifestyle that began at age 10 with a two-week sailing class offered through the city’s recreation department. The harbormaster’s job is typically described as being a lead ambassador for Newport Harbor, one of the largest recreational harbors in the country, and includes overseeing a dozen or so employees and an annual budget of $1 million-plus. But like most things in the past year or so, the first several months have been filled with surprises. I caught up with him to learn more.

William “Skip” Kenney

Newport Harbor Foundation Chairman Dennis Durgan has announced the addition of Newport Beach Harbor Commission Chairman William “Skip” Kenney to the Foundation’s board of directors. Kenney joins former Newport Beach Harbormaster Dennis Durgan, Val Lyon, and Devon Kelly. “As we build out our board of directors Skip Kenney’s almost eight years of service as a […]

Board Member Devon Kelly

Longtime Newport Beach resident Devon Kelly has joined the Newport Harbor Foundation board of directors. “Devon brings a wealth of harbor history and knowledge to the Foundation’s mission. She has spent her entire life sailing on the bay and volunteering in the community. Her boundless energy is welcome as we push towards taking our harbor […]

It’s been more than five decades since Newport Beach City Councilman Marshall “Duffy” Duffield started his Duffy Electric Boat company. Duffield built his first boat when he was 16 years old. His company has sold tens of thousands of boats and become synonymous with Newport Beach, where Duffy rides on the harbor are the norm. […]