City Celebrates Opening of New Public Dock and New Electric Patrol Vessel

By Newport Indy Staff – September 15, 2024

Source: Newport Beach Independent https://www.newportbeachindy.com/city-celebrates-opening-of-new-public-dock-and-new-electric-patrol-vessel/


The City of Newport Beach celebrated two significant milestones in Newport Harbor on Wednesday, August 27: opening a new public dock and welcoming the first electric patrol vessel in the Harbor Department fleet.

The new VITA Seal electric boat is also the first all-electric work vessel delivered to any public agency in the United States.

Newport Beach elected officials and harbor commissioners performed a ceremonial ribbon cutting on the 29th Street Public Pier, at 29th Street and Lafayette Avenue, before christening the new electric vessel.

The 29th Street pier brings the total number of public piers in Newport Harbor to 15, following the dedication of the Balboa Marina Public Pier in March. Use of the pier is free for up to three hours during the day.

The 29thStreet dock, near the terminus of the Rhine Channel, can accommodate up to four 20-ft. boats or two larger vessels. It is part of an ongoing expansion of publicly accessible docks, owned and managed by the City, to provide greater access to boaters.

The new electric boat can be utilized throughout a typical 10-hour shift for the Harbor Department without the need to recharge. With a top speed of 30 knots, the boat will generally carry a crew of two staff members and can accommodate up to eight people. In addition, at Marina Park, the City is developing what will be the first publicly accessible vessel charging station in Southern California.

The 29th Street Pier was designed by Moffatt and Nichol and built by Swift Slip Dock and Pier Builders, with a construction cost of $262,000.

The cost of the electric vessel, $229,000, was funded by the City and partially offset by a Clean Off-Road Equipment (CORE) voucher from the State of California.


By Newport Indy Staff – September 15, 2024

Source: Newport Beach Independent https://www.newportbeachindy.com/city-celebrates-opening-of-new-public-dock-and-new-electric-patrol-vessel/

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

Newport Beach City Council members, joined by state and county elected representatives, held a ceremonial groundbreaking event on Friday, Sept. 15 to kick off construction of the Newport Bay Trash Interceptor, a sustainably powered system to collect floating trash before it enters the Upper Newport Bay Nature Preserve, Newport Harbor and beaches.

Newport Harbor Pirates Cove

Newport Beach, known for its pristine beaches and picturesque harbors, has long been committed to preserving its natural resources. To further increase the City’s ability to monitor and maintain water quality in Newport Harbor, the City’s Harbor Department recently deployed two state-of-the-art water quality sensing buoys, or DataPods, in the harbor.

The Newport Bay Conservancy is hosting Coastal Cleanup Day at Upper Newport Bay on Saturday, Sept. 23 from 9 a.m. to noon.

Volunteers will meet at a dozen different mini-cleanup day sites around the 11-mile bay including the Peter and Mary Muth Interpretive Center, Newport Aquatic Center, Big Canyon, Vista Point, Jamboree Bridge, etc. Exact meeting location will be announced and sent to everyone (group leaders) prior to Sept. 21.