High Marks from Pumpout & Dump Station Monitoring Program

Southern California Clean Vessel Act Pumpout & Dump Station Monitoring Program

Recent surveys were conducted on the following Public Docks on Sep 27, 2022.


Fernando Street Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 24.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Near Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 23.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit works really great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Far Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 97.22

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 9.2

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit is working great! Thank you for meeting me George – always a pleasure!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Yacht Basin Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 83.33

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great! However, I recommend replacing the nozzle as it is folding in on itself. Thank you.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Fun Zone Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 91.67

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 25.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 15.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

Newport Harbor Dredging

The long-awaited dredging project for lower Newport Harbor will move forward, following recent approval by the Newport Beach City Council and Port of Long Beach to use dredged sediment for a pier fill project at the port.

This arrangement is similar to Newport Beach’s previous projects in 2011 and 2012, when dredged sediment from Newport Harbor that was unsuitable for open ocean disposal was transported to Long Beach for the Middle Harbor Redevelopment Project.

A rendering of what the public pool complex proposed at Lower Castaways Park would look like from the bay side. It would include a place to launch paddleboards and such. (Courtesy of the city of Newport Beach)

A public swimming pool complex to include a 50-meter pool, a therapy pool, a splash pad and a building for events is moving closer to reality and could become the city’s next successful public-private partnership.

Recently, the Newport Beach City Council approved a change to the city’s general plan that allows the area at Lower Castaways Park to be zoned for development and accommodate the facility.

Having sold four of the five highest-priced Newport Harbor waterfront homes during his 24-year sales career, Coldwell-Banker realtor Tim Smith has been “cleaning up,” but not in the way you might think.

An avid fisherman (he owns a Boston Whaler Realm 38’) and Dover Shores resident who “loves this harbor,” Smith has been focused on how he can help make the bay as clean as possible.