High Marks from Pumpout & Dump Station Monitoring Program

Southern California Clean Vessel Act Pumpout & Dump Station Monitoring Program

Recent surveys were conducted on the following Public Docks on Sep 27, 2022.


Fernando Street Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 24.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Near Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 23.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit works really great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Far Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 97.22

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 9.2

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit is working great! Thank you for meeting me George – always a pleasure!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Yacht Basin Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 83.33

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great! However, I recommend replacing the nozzle as it is folding in on itself. Thank you.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Fun Zone Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 91.67

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 25.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 15.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.

NB Harbor Department Parimal M. Rohit photo credit

The city of Newport Beach, steadily considered a premier boating destination, has made strides, in the last year, to improve services, amenities and educational information available to recreational boaters, residents and tourists. A model was also introduced for a freshly conceived Harbor Department, which also happens to be “new to the world,” according to several city officials.

“A lot has happened/is happening with harbor operations over the past year,” Tara Finnigan, Deputy City Manager, said in an email to The Log. “A lot of thought and effort went into the department structure that the city council approved on June 12.”

In addition to approving the department structure, council members approved the new budget of $1.1 million – up around $200,000 from last year’s budget – to be included in the 2018-19 fiscal year at the June 26 meeting.

Continue reading at The Log…

Photo Credit: Devon Warren/The Log

Newport Harbor Aerial

The Newport Beach City Council approved an agreement with a firm for federal advocacy services related to harbor dredging efforts and programs, Feb. 27. Carpi & Clay was retained to represent Newport Beach at the federal level in hopes the firm would help bring the city’s issues to the forefront when it comes to harbor dredging.

“The city has been actively working with the U.S. Army Corps of Engineers … and to a limited extent, federal elected representatives, to present and educate them on our dredging needs in Newport Harbor, as well as to get our project on the Corps’ upcoming project funding list,” city staff told council members in a report. “Keeping our project in focus and on the recommended funding list of both the Corps and the many elected representatives that need to review and approve it is, and continues to be, a significant challenge particularly because we do not have a presence in Washington, D.C.”

An Army Corps study in 2017 revealed there is about 650,000 cubic yards of sediment remaining in federal waters and must be dredged to “maintain adequate navigation.”

Continue reading at The Log…