High Marks from Pumpout & Dump Station Monitoring Program

Southern California Clean Vessel Act Pumpout & Dump Station Monitoring Program

Recent surveys were conducted on the following Public Docks on Sep 27, 2022.


Fernando Street Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 24.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Near Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 23.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit works really great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Far Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 97.22

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 9.2

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit is working great! Thank you for meeting me George – always a pleasure!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Yacht Basin Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 83.33

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great! However, I recommend replacing the nozzle as it is folding in on itself. Thank you.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Fun Zone Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 91.67

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 25.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 15.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

Harbormaster Vessels

The mooring management and harbor operations shift from Orange County Sheriff’s Department to the city of Newport Beach has been a fairly smooth transition as Harbormaster Dennis Durgan assumes his role.

Durgan took over the responsibility of overseeing more than 1,200 moorings from the Sheriff Department’s Harbor Patrol Division in July, with Newport Beach hiring 13 part-time harbor workers and obtaining two additional vessels.

The amount of foot traffic coming into Marina Park, where Durgan’s office is located, after the operational shift in management was unexpected.

Continue reading at The Log…
Photo Credit: Nina K. Jussila/The Log