A follow-up status of two significant derelict vessels, both of which were removed from the harbor last week.

I am pleased to report that “New Beginnings”, a 1972 Hatteras 56’, which was known as a problematic vessel in several Southern California harbors, was dismantled and removed from Newport Harbor last Friday, January 16th.  During its dubious final stay in Newport Harbor, it racked up more than $50K in fines and fees.  The cost to have the vessel and its hazardous contents removed was more than $30K.  It’s unlikely another harbor would have dealt with this situation as swiftly and completely as we have.  Other harbors don’t have the laws/codes, resources, and focus on the potential for situations like this to devolve so thoroughly. 

New Beginnings - Dismantled

New Beginnings – Dismantled

The vessel “Haven” was also removed permanently from the harbor last week after a lengthy and complicated stay.

A foreign owner purchased the vessel about a year ago with the best of intentions for having it transported to a lake near his home in Europe and then undertaking a restoration.

Unfortunately, the owner was unfamiliar with many of the challenges associated with such a project, including but not limited to:

  • How a 60+ year old, 40’ wooden boat could be transported internationally
  • The boat yard that handled the inspection and was keeping the boat until transport arrived wanted to be paid and the boat removed so the space could be freed up for other work
    • Aside:  the boat yard eventually asked the Harbor Department to execute an impound to have the vessel removed from their premises
  • There were costs associated with continuing to store the boat here in Newport Harbor, as arrangements were made to transport it
  • Registration and insurance requirements associated with storing a boat in Newport Harbor
  • Operability requirements associated with storing a boat in Newport Harbor

All this to say, the owner quickly gave up on the project and left the situation for us to deal with.

In this case, we were able to recoup a portion of the costs for removal and destruction from the owner who abandoned the vessel. 

There is one other significant vessel in our sights at the moment.  The boat is in impound with us, and we have just initiated the process to declare the boat abandoned.

The registered owner has claimed for several months that he is prepared to retrieve it and have it brought into compliance with harbor requirements.

However, the boat yard with which he has been in negotiations just last week informed us they are no longer willing to do business with the owner.

We will move forward as quickly as legally allowed with the eventual removal of this vessel as well.

Warm regards,

Paul Blank

Harbormaster
Harbor Department
City of Newport Beach

The California Coastal Commission is preparing to consider permitting plans for an important Newport Harbor dredging project. The City of Newport Beach would like to remind residents about the critical need for this project and clarify key topics, including the rigorous environmental analysis that supports the proposal.

Dredging Newport Harbor is critical to maintain safe navigation and a well-functioning harbor. Over the past several decades, sediment has washed down into Newport Bay and accumulated at the bottom of Newport Harbor, which reduces water depths, impedes navigation and diminishes natural tidal flushing. Periodic dredging of Newport Harbor is essential to maintain safe, navigable waterways for recreational, commercial and public safety vessels; increase necessary ocean water flushing to support good water quality and habit and support the economic vitality of the harbor. In total, the project will dredge and remove about 1.2 million cubic yards of accumulated sediment, therefore returning the waterways to their original depths of -10 to -20 feet. Without dredging, sediment will continue to build up, making navigation more difficult and dangerous and decrease tidal flushing, leading to more stagnant water conditions.

To Residents, Yachtsmen and Newport Harbor Users:

The City of Newport Beach has been working with the Army Corps of Engineers for several years on a significant dredging project that will bring Newport Harbor to its authorized design depth which will enhance water quality, allow the bay to properly flush thus eliminating the need to dredge again for many years, remove some unsuitable materials that are lying on the floor of the bay today, and provide for the long term navigability of our harbor.

The Newport Beach City Council certified the Environmental Impact Report (EIR) in May 2021 and directed staff to proceed with securing permits for the project. The EIR is posted on the City’s website here.

The Newport Harbor Foundation has learned that there are a few in the community that are spreading spurious misinformation about the project and the Newport Harbor Foundation believes that it is important that presenting those interested in the dredging project be provided with the facts.

Chairman Murray and Members of the Santa Ana Regional Water Quality Control Board:

My name is Dennis Durgan and I serve as Chairman of the Newport Harbor Foundation. The Foundation was founded in 2019 for the purpose of preserving, protecting and enhancing Newport Harbor for the benefit of the City of Newport Beach, the homeowners on or near the bay, the commercial operators in the bay, and the recreational users of the bay. The Foundation’s founders, contributors, and members are made up of individuals and business who have a long history of using and enjoying the harbor and a vested interest in its enhancement and preservation for use by current and future generations. On behalf the Foundation and its Board of Directors, I am reaching out to you to express our support for the currently pending project for dredging of Newport Harbor and construction of the confined aquatic disposal (CAD) site.