High Marks from Pumpout & Dump Station Monitoring Program

Southern California Clean Vessel Act Pumpout & Dump Station Monitoring Program

Recent surveys were conducted on the following Public Docks on Sep 27, 2022.


Fernando Street Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 24.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Near Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 94.44

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 23.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit works really great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


15th Street Pumpout Station (Far Unit)

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 97.22

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 9.2

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • Unit is working great! Thank you for meeting me George – always a pleasure!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Yacht Basin Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 83.33

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 22.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 10.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great! However, I recommend replacing the nozzle as it is folding in on itself. Thank you.
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.


Balboa Fun Zone Pumpout Station

Summary of the survey:


Overall Status[1]
Unit was: Operational

Pumpout Usability Score[2]

  • Pumpout usability score for this quarter: 91.67

Usability Measurements

  • Vacuum at the nozzle in inHg (optimum is 22): 25.0
  • Pumpout time for 5 gallons of water in seconds (20 or less is optimum): 15.0

Dye Table Test[3]

  • Dye tab performed (if previously authorized): Yes
  • Leak detected: No

Notes from Monitoring Team

  • The unit is working great!
[1] This status is immediately displayed on the Pumpout Nav app. If not accurate, please contact us at the emails listed above.
[2] Pumpout usability score is determined in part by the above measurements and indicates the likelihood of a boater having a positive experience at this disposal unit. An annual California Pumpout Report can be downloaded here.
[3] We offer a free voluntary dye tablet test (if previously authorized) when conducting our quarterly monitoring of the disposal unit. This allows us to detect any leaks in your sewage system.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

The Newport Bay Conservancy is hosting Coastal Cleanup Day at Upper Newport Bay on Saturday, Sept. 23 from 9 a.m. to noon.

Volunteers will meet at a dozen different mini-cleanup day sites around the 11-mile bay including the Peter and Mary Muth Interpretive Center, Newport Aquatic Center, Big Canyon, Vista Point, Jamboree Bridge, etc. Exact meeting location will be announced and sent to everyone (group leaders) prior to Sept. 21.

Join Nancy Gardner as she chats with former Harbor Commission Chair Bill Kenney and Senior Civil Engineer John Kappeler about the upcoming Newport Beach water wheel project.

The Balboa Island Ferry, one of our most iconic Newport Beach tourism experiences, could be no more.

If that sounds dramatic, it is. I can’t imagine our city without the ferry, but unless something is done, this treasured piece of our city could be gone in less than two years.

Thousands of locals and visitors use the ferry every year and it’s a vital part of our culture and history. It is part of what makes us Newport Beach, and in my mind, it is as important as our beaches. But all of that is now threatened and could be lost.